NISSUM BREDNING OFFSHORE WIND FARM

1/1

Nissum Bredning 2017

  • Production of 4 pcs of concrete transition pieces – 1200 T each

  • Installation of accesorries like railings, doors, davit cranes, tents

  • The TP consists of 3 box-girder shaped arms and a connecting centrepiece. It is made of reinforced concrete with additional prestressing tendons. The connection between the TP and the tower consists of a cast-in BAC with standard bolts in two different lengths, and the connection between the TP and jacket consists of a reinforced cast-in connection.